Home / Projects / Worker Accommodation / Kazakhstan Engineering Camps

Kazakhstan Engineering Camps

Product Type:
Application:
Country:
Kazakhstan
Units:
144 Sets
Floor Area:
5000 Sqm
Completion Time:
2026 Years

ReachTop’s engineering camp in Kazakhstan was officially completed in 2026. The project mainly uses detachable container houses, which are constructed with 100mm thick rock wool panels and 3.0mm thick frames. The two-story design is reinforced with galvanized pipes at the bottom, making it the top-of-the-line detachable container house. To ensure the long-term success of the project, a custom-developed roof was added to eliminate the risk of water leakage. There are a total of 144 houses.